Paint and fix up my bedroom/office, build shelves in closet
Pulsatile Craft and Cosplay DK30 Fall 2020 5 5
Description
I need to move my home office into my bedroom to clear some space in my current office. So it seems like a good time to also paint and redecorate the room, and build some shelves for my closet.
Recent Updates
Project is largely complete. To summarize, the painting and shelf building was more work than expected, and there’s still more decorating and organizing to do, but I’m very happy with the progress.
Here are some before/after comparison shots of the room:
Forgot to post earlier about how I built the shelves, but here’s some pictures of how they are put together. Excuse the fact that some are different colors. I still need to stain some of the shelves:
I did finish painting the room last week. I’ll get some pictures up in the future.
Today I picked up the lumber for the shelves, and started cutting them using my Dad’s rusty old table saw, and also started staining them.
So apparently painting a room is a lot of work. Or I’m just really bad at it. Maybe both. Either way, I was only able to one coat of paint on and am going to have to get the second coat on next weekend. It’s kinda splotchy at the moment, but the second coat should smooth that out, right? Right??
That aside, I’m very happy with the color I chose:
Got a late start this weekend, and am pretty inexperienced at painting, so I didn’t get as much done as I hoped. But I did get the walls taped, and got a coat of paint on one of the walls. And decided to paint that upper section as well as you can see.
I think I’ve got my rhythm down now though so I should be able to finish up tomorrow.
Trying to decide if I paint the upper section of the wall that hangs over a bit. Here’s how it would look each way. Actual color is a darker blue.
Got some paint samples and tested a couple colors. I’m going with the dark navy blue:
Heres what the bedroom and closet look like on Day 1:
Estimated Timeframe
Oct 15th - Nov 15th
Week 1 Goal
Paint the room over the weekend, and later in the week assemble the desk I ordered. I have all the paint supplies already, I just need to pick the color and pick up the paint.
Week 2 Goal
Finalize the design and dimensions of the closet shelves, pick up the lumber, and cut and stain the boards for one of the shelves. Install that shelf and make sure all is good with the design.
Finish figuring out layout of bedroom/office. Assemble the desk file cabinet and hutch.
Week 3 Goal
Cut the remaining boards and install the rest of the shelves.
Order any other needed furniture and room decoration.
Week 4 Goal
Finish decorating room, mount TV to wall, hang pictures, etc.